New S.S. 415 “Paullese” junction – Milano (MI) – Italy

Final and detailed design of structural works

 

Client: Municipality of Milano

Structural works value: 1.808.000,00 €

Design period: 2000

 

It is the modernization of the junction between the East ring higway of Milano and the national road SS415 “Paullese” with the creation of a new connection with the and the urban development areas Montecity and Rogoredo.

The project involved two double span overpasses with circular planimetric development and five curved underpass with variable section; the static scheme adopted for all the works is an unbrached frame.

All the structures are made of reinforced concrete cast in place

The foundations are set on medium-diameter bored piles.

S.P.S. S.r.l. Via Melchiorre Gioia 64, 20125 Milano P.I. 10807630156 | R.E.A. MI-1409653 | Tel. +39 02 6694887 | segreteria@spssrl-mi.it | privacy&cookiepolicy