New intercharge Forlanini, Tangenziale East, Milan

Svincolo Forlanini sulla Tangenziale Est di Milano

Preliminary, final and executive design of the structures (2000 - 2003)

Customer: SIPIT S.r.l.

The design consists of two viaducts equal to around 376 m length and 18 m overall width, realized in a mixed structure of steel-concrete with variable section thin-walled box steel beams completed by a collaborating reinforced concrete slab. The piers are single bladed in reinforced cement for each box and the foundations are on poles of diameter 120 cm with shoulder loops on diaphragms.

Structural work amounts: ~ 11.500.000,00 €

The construction has been completed in 2008.